Mississippi River Power Company
Biography
An excellent pictorial record of the construction of the dam across the Mississippi. From Roald D. Tweet, Taming the Des Moines Rapids: The Background of Lock 19: "Such a dam marked a serious shift of direction for navigation improvement on the Mississippi. Several earlier dams had been proposed at various locations, but none had ever been built. The River and Harbor Act of June 13, 1902, authorized a survey of the Mississippi at Keokuk 'to determine whether a dam constructed at the foot of said rapids would be a benefit or impediment to the navigation of said river.' The subsequent detailed and careful examination and report was favorable to the project. A single lock, together with the deep long pool which the dam would create, would flood the entire Des Moines Rapids, cutting both time and operating expense by 20% over the canal. Local residents and commercial interests favored the plan. In 1905 Congress authorized the Keokuk and Hamilton Water Power Company to proceed with the design and construction of the project. In addition to a new dry dock to replace the canal dry dock, and to provide free power to operate all lock and dry dock machinery, the lock was to be of sufficient dimensions to meet the requirements for an improved six-foot channel. "Actual construction began in January 1910. Throughout the project, two complete crews worked, one from the Illinois side building the dam, and the other from the Iowa side building the dry dock, the lock, and the power house. For three years the dam slowly grew across the river, a cofferdam to keep the construction site dry proceeding just ahead of the work. Construction on the Iowa side was more complicated because it involved a number of projects, and because the canal had to be kept open to navigation. Construction on the Iowa side began in the spring of 1911 with the power plant. A cofferdam surrounding 23 acres was built out from the Des Moines Rapids Canal embankment. Here work on the power plant and new lock progressed during 1911 and 1912. "By the middle of 1912 the dam was three-quarters of the way across the Mississippi. At its peak the project employed 1,200 men and used three steam shovels, five derrick cars, thirty dump cars, and fifteen locomotives operating over twenty miles of track. The last concrete was poured in the dam in May of 1913. "On May 31, the company, now called the Mississippi River Power Company, held a locomotive parade across the new dam from Illinois to Iowa. The completed lock was turned over to the government in late spring. On June 12, 1913, Rock Island District employees opened the lock with little fanfare, eighteen days ahead of schedule"
Found in 1 Collection or Record:
Mississippi River Power Company Papers
Building a dam across the Mississippi River at Keokuk, Iowa as pictured in a series of 94 large photographs (58) and photograph postcards (36) of the project, 1911-1913. Images, 6 x 9 to 8 1/2 x 11 inches, picturing phases of the project from scenes of the city and countryside before the dam's construction through activation. Accompanied by Electric Power from the Mississippi River (Keokuk, IA: Mississippi River Power Company, May 1911, Bulletin No. 2), a status report on the construction to that time.