Skip to main content

48. PROPOSAL ALTERNATIVES FOR PROJECT PLAN CARD READER TERMINAL, 1968 September

 File — Box: 1
Identifier: 1

Scope and Contents

This 62-page Technical Report of mine deals with the many difficult design issues, tradeoffs, and alternatives we were facing by the fall of 1968 - prior to the anticipated WLC senior management directive in the fall of 1969 for MRC Engineering to begin manufacturing 150 of the MRC readers

Dates

  • Creation: 1968 September

Creator

Conditions Governing Access

This collection is open for research.

Extent

From the Collection: 14.50 Linear Feet

Language of Materials

From the Collection: English

Repository Details

Part of the University of Iowa Archives Repository

Contact:
100 Main Library
University of Iowa Libraries
Iowa City IA 52242
319-335-5921